Same label ≠ same construction
Category names can hide differences in conductor, shielding, connector, jacket, test basis, and packaging.

Buyer comparison center
Select up to three SUNPU product directions. Use the result to identify specification gaps before requesting samples or a quotation.
Choose models
Products from different families can be compared, but a valid substitute must still be reviewed against the same system role, interface, performance target, and environment.
Side-by-side review
Blank or different fields are review points—not automatic failures. Confirm the exact quoted construction and model-level evidence before approval.
| Decision field | SP-F104-PLC-BSP-F104-PLC-B Dome Fiber Optic Splice ClosureOpen product page → |
|---|---|
| System family | Fiber & Rack Management |
| Product role | Fiber / Dome Splice Closure |
| Product direction | A dome fiber optic splice closure platform for protected feeder and distribution cable jointing, tray organization, and route-specific sealing configuration. |
| Key identifiers | Fiber Closure · Dome · Splice Management · SP-F104-PLC-B |
| SUNPU product reference | SP-F104-PLC-B |
| Product family | Dome Fiber Optic Splice Closure |
| Catalogue basis | SUNPU Fiber Optic Closure and Distribution Product Catalogue 2026; reference section begins on page 5 |
| Configuration review | Confirm fiber capacity, cable entry count and diameter, tray arrangement, adapter or splitter loading, sealing method, and installation environment for the exact model |
| Dimensions and performance | Confirm the final mechanical dimensions, material, ingress protection, included accessories, and available test documents against the quoted model |
| Typical applications |
|
| Configuration fields |
|
| RFQ inputs |
|
Category names can hide differences in conductor, shielding, connector, jacket, test basis, and packaging.
A field not shown on the website should be confirmed in the quotation or controlled specification, not guessed.
Compare products that perform the same job in the channel and verify surrounding-component compatibility.
Certificates, declarations, reports, and inspection records must be checked against the selected construction.